s90

Insights

AEC

IT for AEC firms: Autodesk licensing, large project files, field connectivity, and CMMC and NIST SP 800-171 requirements for firms on defense projects.

Architecture, Engineering and Construction

How to approve AI plugins for Revit, AutoCAD and Bluebeam

AI add-ins for Revit, AutoCAD and Bluebeam run inside the software that holds client drawings. A checklist for architecture and engineering firms on vetting each plugin, how each program loads them and keeping unapproved ones off workstations.

CMMC conditional status: can you close your POA&M in 180 days?

Conditional CMMC status gives a contractor 180 days to close a short list of low-weight gaps. Here is who qualifies under 32 CFR 170.21, what can never be deferred, what happens if the clock runs out, and how the Phase 2 suspension fits in.

What happens during a CMMC Level 2 C3PAO assessment?

The CMMC assessment process for Level 2 is still running during the Phase 2 suspension. What an AEC firm should expect: the evidence to have ready, how C3PAO assessors examine, interview and test, how scoring works, and what happens after.

How should construction firms verify bank change requests?

Fake bank change requests turn routine progress payments into losses. How vendor impersonation fraud works on construction projects, the callback the FBI recommends for vendor bank account verification, and what the 2026 Nacha fraud monitoring rule means for firms paying by ACH.

s90

One question to ask yourself

Does your IT provider show you proof without you having to ask?

Up to$500,000Cyber WarrantyBacked by Cork Inc.

In 30 minutes, we talk through your setup and you leave knowing which plan fits.

Book a call

See exactly what you'd receive each quarter, by email.

Get the sample Posture Report by email